Tesla Powerwall 3
13.5 kWh usable and up to 11 kW continuous from a single unit, with a built-in solar inverter. Three-phase version, the Powerwall 3P, available in Portugal.
97.5%solar-to-home efficiency
With a Tesla Powerwall charged by the sun, your home keeps its lights on. With Starlink powered by the Powerwall, it stays online. Even in a blackout.
From €10,800 incl. VAT1 single-phase Powerwall 3, Backup Gateway 2 and installation
13.5 kWh usable and up to 11 kW continuous from a single unit, with a built-in solar inverter. Three-phase version, the Powerwall 3P, available in Portugal.
97.5%solar-to-home efficiency
640 W panels connected to the Powerwall 3 inverter: the daytime sun is stored for the evening.
≈ 930 kWhper panel per year, on a well-oriented roof in Portugal
Tesla home charger, which you can add to the Powerwall in the same request.
22 kWmaximum charging power, three-phase
Fast satellite internet anywhere in Portugal. Powered by the Powerwall, it stays online in a blackout.
≈ 170 Mbpsmedian download speed in Portugal (Ookla, first quarter of 2026)
Our impact
That's what the homes and businesses where we've installed solar panels in Portugal no longer emit, every year.
Totals up to September 2026.
Not without a battery: they shut down for safety when the grid fails. It's the Powerwall, with the Backup Gateway 2, that keeps your home running.
Yes. Most panels connect directly to the Powerwall's built-in inverter, which takes up to 20 kW of panels and is the most efficient option. Alternatively, you keep your existing inverter and the battery charges from the energy it produces, with lower efficiency, because the energy is converted more times.
The 10-year Tesla warranty requires the Powerwall to stay connected to the internet; without a connection, the warranty is 4 years.
There is currently no open Fundo Ambiental call for homes. Panels, batteries and installation are charged VAT at 23%.
An installation up to 30 kW only needs a prior notice on the platform of the Directorate-General for Energy and Geology (DGEG), at no cost. Only installations up to 800 W without grid export are exempt.
Free and tailored to your home. Answer a few questions and receive the proposal by email; the site visit is scheduled afterwards.